The information contained in this training is CONFIDENTIAL to Xtreme Engineered Floor Systems employees.

Do not distribute.

SURFACE PREPARATION

PATCHING

HYBRID XT VINYL CHIP INSTALLATION

Steel Trowel Primer Installation Instructions (for Solid Color, Platinum, & Self-Leveling System)

SOLID COLOR

TEXTURED SYSTEM

PLATINUM COLOR PIGMENT SYSTEM

QUARTZ DOUBLE BROADCAST SYSTEM

MAGNUM URETHANE TOPCOAT

HD-PC (HEAVY DUTY POLYURETHANE CONCRETE)

PERFORATED MESH LOGO INSTALLATION

X-SHINE CONCRETE POLISHING SYSTEM

REQUIRED PPE (PERSONAL PROTECTION EQUIPMENT)

  • SAFETY GLASSES

  • STEEL TOE BOOTS

  • PROPER GLOVES WHEN WORKING WITH CHEMICALS & RESINS

  • HEARING PROTECTION

  • HI-VIS VEST WHEN REQUIRED

  • HARD HAT WHEN REQUIRED

  • N-95 MASK WHEN REQUIRED (SEE SILICA CONTROL PLAN)

*CERTAIN TASKS & JOBSITES MAY REQUIRE ADDITIONAL PPE (PERSONAL PROTECTION EQUIPMENT)

Agreements *