The information contained in this training is CONFIDENTIAL to Xtreme Engineered Floor Systems employees.
Do not distribute.
SURFACE PREPARATION
PATCHING
HYBRID XT VINYL CHIP INSTALLATION
Steel Trowel Primer Installation Instructions (for Solid Color, Platinum, & Self-Leveling System)
SOLID COLOR
TEXTURED SYSTEM
PLATINUM COLOR PIGMENT SYSTEM
QUARTZ DOUBLE BROADCAST SYSTEM
MAGNUM URETHANE TOPCOAT
HD-PC (HEAVY DUTY POLYURETHANE CONCRETE)
PERFORATED MESH LOGO INSTALLATION
X-SHINE CONCRETE POLISHING SYSTEM
REQUIRED PPE (PERSONAL PROTECTION EQUIPMENT)
SAFETY GLASSES
STEEL TOE BOOTS
PROPER GLOVES WHEN WORKING WITH CHEMICALS & RESINS
HEARING PROTECTION
HI-VIS VEST WHEN REQUIRED
HARD HAT WHEN REQUIRED
N-95 MASK WHEN REQUIRED (SEE SILICA CONTROL PLAN)
*CERTAIN TASKS & JOBSITES MAY REQUIRE ADDITIONAL PPE (PERSONAL PROTECTION EQUIPMENT)